Massachusetts Permitting Checklist
Air Air Plan Approval Applications – forms and instructions for owner/operators of facilities that are being newly built, substantially reconstructed, or altered and have the potential to cause or contribute to air pollution. Application for Property Tax Exemption for the cost of air pollution control equipment Regional Greenhouse Gas Initiative Consistency Applications Compliance Certification for […]
- Air
- Air Plan Approval Applications – forms and instructions for owner/operators of facilities that are being newly built, substantially reconstructed, or altered and have the potential to cause or contribute to air pollution.
- Application for Property Tax Exemption for the cost of air pollution control equipment
- Regional Greenhouse Gas Initiative Consistency Applications
- Compliance Certification for Commercial, Industrial, and Institutional Boilers rated between 10 million and 40 million BTU per hour
- MassDEP Emission Control Plan
- MassDEP Compliance Certification for Stationary Engines and Turbines: applies to emergency generator, fire pump, or other engine rated at 37 kilowatts and up and to non-emergency engines rated 50 kilowatts and up
- MassDEP Source Registration
- MassDEP permit for “Major Sources of Air Pollution” and Title V Operating Permits
- Hydropower
- MassDEP Dam Registration
- MassDEP Dam Construction Chapter 253 Permit Application
- Energy Facilities Citing Board Hydropower Preliminary Notification Form
- MassDEP Environmental Notification Form
- Land/Wetland
- Chapter 91 Waterways Permit: applies to activities or projects in, under, or over publicly owned waterways of the Commonwealth including placement, construction, or alteration of any structure; placement of any fill; demolition or removal of any fill or structures; dredging
- Chapter 91 Waterways Permit
- MassDEP Wetlands Protection Act Determination of Applicability
- MassDEP Wetlands Protection Act Notice of Intent
- MassDEP Wetlands Protection Act Request for Certificate of Compliance
- MassDEP Wetlands Protection Act Notice of Non-Significance
- MassDEP Rivers Protection Act Notice of Intent
- General
- MassDEP Construction Notification
- Conservation Commission Approval
- Local Planning Board Site Plan Review
- Sewer Connection/Extension Permits
- Road Opening Permit
- MassDEP Notification for Underground Storage Tanks
- Hazardous Waste
- Mass DEP Hazardous Waste Generator Registration Form
- MassDEP Notification of Hazardous Waste Activity Form
- National Hazardous Waste Manifest Form
- Solid Waste
- MassDEP Site Suitability Report for use of site for a solid waste management facility
- MassDEP Permit to Construct new or to expand solid waste facility
- MassDEP Authorization to Operate Solid Waste Management Facility
- MassDEP Permit to Modify Solid Waste Facility
- MassDEP Beneficial Use Determination for use of a solid waste as a substitute for a commercial product
- MassDEP Recycling, Composting, or Conversion Operation Permit
- Massachusetts DOT
- MassDOT Application for Driveway, New Street, or Sidewalk Construction
- MassDOT Application for Driveway, New Street, or Sidewalk Construction
- Water
- MassDEP Water Management Act Permit
- MassDEP Groundwater Discharge Permit
- MassDEP Reclaimed Water Use Permit
- MassDEP Permit for Industrial Sewer Use
- MassDEP Industrial Wastewater Holding Tank Permit
- MassDEP Treatment Works Plant Approval
- MassDEP NPDES Stormwater General Permit
- Wildlife/Plant
- Massachusetts Endangered Species Act – Exemption Filing
- Massachusetts Endangered Species Act – No Take Determination
- Massachusetts Endangered Species Act – Conservation & Management Permit
- Municipal
- Ability to Serve Letter
- Building Permits
- Certificate of Occupancy
- Site Plan Review
- Special Exception of Conditional Use
- Variance, space, and bulk, use
- Zoning (check for proposed use)